![YASKAWA CIPR-GA50C series Technical Manual Download Page 49](http://html2.mh-extra.com/html/yaskawa/cipr-ga50c-series/cipr-ga50c-series_technical-manual_3241765049.webp)
YASKAWA
SIEPC71061753A GA500 Technical Manual
49
Figure 3.1 Standard Drive Connection Diagram
*1
Set the wiring sequence to de-energize the drive with the MFDO. If the drive outputs a fault during fault restart when you use the
fault restart function, set
L5-02 = 1 [Fault Contact at Restart Select = Always Active]
to de-energize the drive. Be careful when you
use a cut-off sequence. The default setting for
L5-02
is
0 [Active Only when Not Restarting]
.
*2
When you install a DC reactor, you must remove the jumper between ter1 and +2.
Summary of Contents for CIPR-GA50C series
Page 2: ...This Page Intentionally Blank 2 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 12: ...12 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 44: ...2 9 Installation Methods 44 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 110: ...3 17 Motor Application Precautions 110 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 150: ...4 12 Test Run Checklist 150 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 156: ...5 2 European Standards 156 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 158: ...5 2 European Standards 158 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 288: ...7 10 Troubleshooting Without Fault Display 288 YASKAWA SIEPC71061753A GA500 Technical Manual...
Page 306: ...8 6 Storage Guidelines 306 YASKAWA SIEPC71061753A GA500 Technical Manual...