Connection
4.14 Connecting the Power Module with the CM PM-E 7/8" Connection Module
ET 200pro distributed I/O system
134
Operating Instructions, 03/2013, A5E00335544-08
4.14
Connecting the Power Module with the CM PM-E 7/8" Connection
Module
Introduction
You connect the load voltage supply 2L+ to the CM PM 7/8" connection module using the
7/8" connector X01.
Requirements
The power module and bus module are mounted on the rack.
Required tools
Screwdriver and stripping tool for wiring the 7/8" connector, if you are fabricating your own
cables.
Required accessories
●
Prefabricated cable with 7/8" cable connector. The cable is available in different lengths.
●
If you are fabricating your own cables:
–
7/8" connectors
–
3-wire cable