Connection
4.13 Connecting the Power Module with the CM PM-E ECOFAST Connection Module
ET 200pro distributed I/O system
Operating Instructions, 03/2013, A5E00335544-08
133
Pin assignment of the ECOFAST cable connector
View of the ECOFAST cable connector
Terminal
Assignment X01
Feed for X01
1
Not assigned
2
Not assigned
3
Ground for load voltage supply 2M
4
2L+ load voltage supply
Connecting the ECOFAST cable connectors
1.
Insert the CM PM ECOFAST connection module into the power module.
2.
Screw the CM PM ECOFAST connection module onto the power module
(torque = 1.5 Nm). Tighten both screws evenly. The screws are already inserted in the
connection module.
3.
Open the interlock for the ECOFAST cable connector on the connection module.
4.
Plug the ECOFAST cable connector (2L+) into the socket of the connection module.
5.
Close the interlock for the ECOFAST cable connector.
NOTICE
It is not allowed to remove the ECOFAST cable connector while ET 200pro is in
operation! Always switch off the load voltage supply (2L+) before you remove the
ECOFAST cable connector.
Note
Removal of the ECOFAST cable connector interrupts the supply to all downstream
modules.
Closing the unused socket
Always close any unused ECOFAST sockets using a cap in order to achieve the degree of
protection IP65, IP66 or IP67.
See also
PM-E power module (Page 319)