Connection
4.5 Connecting the interface module to a CM IM DP Direct connection module
ET 200pro distributed I/O system
80
Operating Instructions, 03/2013, A5E00335544-08
See also
Preparing PROFIBUS DP Cables (Page 80)
Preparing PROFIBUS Hybrid Cables for the Connection at CM IM DP Direct (Page 81)
4.5.2
Preparing PROFIBUS DP Cables
Required tools
●
Cross-tip screwdriver, size 2
●
25-mm open-end wrench
●
PROFIBUS Fast Connect stripping tool
Opening and preparing the connection module
1.
Remove the two screws from the bottom of the connection module using a crosstip
screwdriver.
2.
Remove the cover from the connection module.
3.
Install M20 screwed cable glands at the cable inlets using an open-end wrench. The blind
plates will break off automatically when you screw in the glands. Tighten the cable glands
on the connection module (torque = 3 N/m).
4.
Feed the PROFIBUS DP cables through the bottom cable glands in order to obtain the
maximum bending radius.
5.
Feed the supply voltage cables through the upper cable glands.
Stripping PROFIBUS DP cables
1.
Strip the PROFIBUS DP cable as shown in the figure.
Figure 4-7
Stripping dimensions for the PROFIBUS DP cable
Result
You can now connect the power supply and PROFIBUS DP cables.