5. POWER STEERING PUMP
…………………………...……………………………………………...154
6. POWER STEERING CYLINDER
……………………….……….…..………………………………..154
7. TROUBLE SHOOTING
………………………………….……………..…………………………….155
3-9 Hydraulic System
………………………………………….………………………………………156
1. SPECIFICATIONS……………………………………….………………………….……………...156
2. HYDRAULIC CIRCUIT……………………………………………………….…………………..156
3. CYLINDER CASE ASS’Y………………………………………….……………….……………..157
4. CONTROL VALVE ASSEMBLY………………………………….…………………………….…161
5. CONTROL VALVE ASSEMBLY………………………………….………….…………………....165
6. REMOTE CONTROL VALVE……………………………….………….……...………………….178
7. TROUBLE SHOOTING……………………………………….………………...………………...182
3-10 Electric Units and Accessories
………………….………….……...………….…….…………..183
1. INTRODUCTION…….……………….………………….………….……...…….….………….…183
2. COMPONENTS LOCATION………………………………..……...…………………….……..…185
3. DESCRIPTION OR TESTING………………………………..……...……………….……………186
4. WIRING………………..………………………….….………….……...…………………………..233
3-11 Cultivating Implement Installing Device
……...…….………….……...………….…..………235
1. Three Point Link………………..……………….………….……...…………………………….…235
2. PTO (Power Take-Off Shaft)……………………………….……...……………….………….….236
3-12 Maintenance Standards Table
………………
.………….……...……
…………….……..…….237
Summary of Contents for ST330
Page 5: ...1 Chapter 1 GENERAL...
Page 29: ...24 2 1 Engine Sectional View 100Y 101Y...
Page 74: ...64 Chapter 3 TRACTOR MAIN BODY...
Page 96: ...86 1 SECTIONAL VIEW 360Y 3 4 Transmission 1 for HST...
Page 98: ...88 2 HST unit 362Y...
Page 127: ...117 2 Two Speed PTO Model 403Y 9 3 Transmission Without one way clutch 2 Speed PTO...
Page 197: ...186 2 COMPONENT LOCATION 517Y...
Page 245: ...233 4 WIRING 518aY...
Page 246: ...234 518bY...