22
(
6) STEERING WHEEL NUT
The nut for steering wheel is tightened
to 25.5~33.3 N·m
(2.6~3.4 kgf·m)
(7) BATTERY CABLE
①
Fit the positive battery cable first then the negative
.
050Y
051Y
2.
TRIAL RUNNING
After overhaul engine it will need a trial run – Refer to the following
1) Check the quantity of the coolant, engine oil and fuel.
2) Disconnect the wiring harness connector as the engine stop solenoid.
3) Move the hand throttle lever to the low throttle position and foot throttle to the free position.
4) Turn the key switch to the “Start” position (rotate the starting motor) until the oil pressure lamp goes off. (About 20 – 30
seconds).
5) Turn the key switch to the “Off” position.
6) Connect the wiring harness connector at the engine stop solenoid.
7) Move the hand throttle lever to the half throttle position and start the engine.
8) Adjust the low speed engine running and warm up on at the same time as follows:
●
Check for abnormal sounds.
●
Check the coolant temperature.
●
Check the engine oil temperature.
●
Check the engine oil and coolant leaking.
●
Check the coloring of exhaust gas.
Summary of Contents for ST330
Page 5: ...1 Chapter 1 GENERAL...
Page 29: ...24 2 1 Engine Sectional View 100Y 101Y...
Page 74: ...64 Chapter 3 TRACTOR MAIN BODY...
Page 96: ...86 1 SECTIONAL VIEW 360Y 3 4 Transmission 1 for HST...
Page 98: ...88 2 HST unit 362Y...
Page 127: ...117 2 Two Speed PTO Model 403Y 9 3 Transmission Without one way clutch 2 Speed PTO...
Page 197: ...186 2 COMPONENT LOCATION 517Y...
Page 245: ...233 4 WIRING 518aY...
Page 246: ...234 518bY...