37
5)
Connecting rod
Inspection
(1) Check for torsion, parallelism and damage.
Measure the torsion and parallelism using a connecting
rod aligner and correct or replace if the repair value is
exceeded.
(2) Measure the bore of the connecting rod small end bush
and replace if the clearance to the piston pin exceeds the
service limit.
(3) Install the connecting rod to the crankshaft, measure the
axial play and replace the connecting rod if the service
limit is exceeded.
125Y
1.
Gauge
2.
Piston pin
3.
Torsion
4.
Flat part of aligner
5.
5. Pin
Clearance between bush and piston pin (mm)
Standard assembling value
Service limit
0.008 – 0.023
More than 0.08
Axial play of connecting rod and crank pin (mm)
Standard assembling value
Service limit
0.1 – 0.3
More than 0.7
Torsion and parallelism of connecting rod (mm)
Standard assembling
value
Repair value
Torsion (per 100 mm)
Less than 0.08
0.2
Parallelism
(per 100 mm)
Less than 0.05
0.15
Summary of Contents for ST330
Page 5: ...1 Chapter 1 GENERAL...
Page 29: ...24 2 1 Engine Sectional View 100Y 101Y...
Page 74: ...64 Chapter 3 TRACTOR MAIN BODY...
Page 96: ...86 1 SECTIONAL VIEW 360Y 3 4 Transmission 1 for HST...
Page 98: ...88 2 HST unit 362Y...
Page 127: ...117 2 Two Speed PTO Model 403Y 9 3 Transmission Without one way clutch 2 Speed PTO...
Page 197: ...186 2 COMPONENT LOCATION 517Y...
Page 245: ...233 4 WIRING 518aY...
Page 246: ...234 518bY...