91
Connection Examples
Section 4-5
4-5-2
PLC Connection Examples
(Host Link)
System Configuration
Cable Wiring (XW2Z200T (2 m) or XW2Z500T (5 m))
Power Supply
(24 VDC)
Monitor
RS-232C Cable
V530-R150
Camera
Programmable
Controller
Power Supply Unit: C200H-PA204S
CPU Unit or Host Link Unit: CS1H-CPU64
I/O Unit: C200H-ID212
XW2Z-200T (2 m)
or XW2Z-500T (5 m)
V530-R150
Programmable Controller
Signal
Pin No.
Pin No.
Signal
Shield
Pin numbers will depend on the CPU unit or Host Link Unit being
connected. Refer to the manual for the Programmable Controller
being connected.
(*)
Summary of Contents for V530-R150E-3 -
Page 7: ......
Page 9: ......
Page 17: ......
Page 27: ......
Page 47: ......
Page 63: ......
Page 224: ...207 System Section 6 4 2 Set each item 3 Select End before leaving this screen...
Page 226: ...209 System Section 6 4 2 Select the error method 3 Select End to leave this screen...
Page 263: ......
Page 279: ......
Page 281: ......
Page 283: ......
Page 289: ......