54
Preparing Flat Connectors
Section 3-3
■
Attaching the Cable
Confirm that the cable colors match the cable labels, and then insert the cable
end all the way to the back of the cover in which the cable stopper has already
been set.
■
Attaching the Housing
Confirm that the cable labels match the cable colors, and then temporarily
secure the housing to the cover.
Note
The housing cannot be removed from the cover once it has been attached.
The connector may be damaged if the housing is forcefully removed.
■
Pressure-welding the Connector
The connector is pressure-welded using the DWT-A01 Pliers.
1,2,3...
1.
As shown below, align the center (see arrows) of the connector cover with
the center of the pressure-welding block on the Pliers.
2.
Squeeze firmly on the Pliers until the lock on the connector clicks into
place.
Note
(1) Do not pressure-weld the connector cover at the edges.
(2) Do not pressure-weld the connector cover at the back of the pressure-
welding block.
Location of cable stopper
Housing
Pliers
Connector cover
Summary of Contents for CRT1 - 10-2008
Page 2: ...CRT1 Series CompoNet Slave Units and Repeater Unit Operation Manual Revised October 2008...
Page 3: ...iv...
Page 5: ...vi...
Page 9: ...x...
Page 15: ...xvi...
Page 23: ...xxiv Conformance to EC Directives 6...
Page 51: ...28 Slave Unit Models Section 1 2...
Page 123: ...100 Connecting External I O for Slave Units Section 3 6...
Page 365: ...342 Temperature Input Units Section 7 5...
Page 381: ...358 Expansion Unit Specifications Section 8 2...
Page 418: ...395 Repeater Unit Section 10 2 Dimensions 42 3 50 3 1 27 5 95 mm...
Page 419: ...396 Repeater Unit Section 10 2...
Page 424: ...401 CX Integrator Section 11 1...
Page 575: ...552 Current Consumption Summary Appendix D 552...
Page 581: ...558 Index...
Page 583: ...560 Revision History...