13-30
4. Remove the used cylinder and the used gasket.
5. Point the cylinder outlet away from all items that can be damaged by a release of high
pressure gas.
6. Quickly open and close the cylinder valve. This removes dirt from the cylinder outlet.
7. Install a new gasket.
8. Align the cylinder post with the index pins.
9. Close the yoke gate and tighten the tee handle.
10. Do a high pressure leak test. For details, refer to section
6.5 Cylinder Tests
.
WARNING
z
Do not leave gas cylinder valves open if the pipeline supply is in use. Cylinder
supplies could be depleted, leaving an insufficient reserve supply in case of pipeline
failure.
z
Use a new gasket when installing or replacing the cylinder.
Gasket
Summary of Contents for WATO EX-65
Page 1: ...WATO EX 65 Anesthesia Machine Operator s Manual ...
Page 2: ......
Page 8: ...VI FOR YOUR NOTES ...
Page 16: ...8 FOR YOUR NOTES ...
Page 25: ...2 3 2 2 Equipment Appearance 2 2 1 Front View Display and control panel ...
Page 27: ...2 5 Breathing system ...
Page 29: ...2 7 2 2 2 Rear View Power supply ...
Page 31: ...2 9 Anesthesia information system CIS ...
Page 42: ...3 8 FOR YOUR NOTES ...
Page 66: ...4 24 FOR YOUR NOTES ...
Page 148: ...11 8 FOR YOUR NOTES ...
Page 152: ...12 4 FOR YOUR NOTES ...
Page 222: ...A 6 FOR YOUR NOTES ...
Page 244: ...B 22 FOR YOUR NOTES ...
Page 250: ...C 6 FOR YOUR NOTES ...
Page 264: ...D 14 FOR YOUR NOTES ...
Page 274: ......
Page 275: ......
Page 276: ...P N 046 000203 00 1 0 ...