6
13.2 Install the Breathing Tubes........................................................................................ 13-19
13.3 Install the Manual Bag .............................................................................................. 13-20
13.4 Install the Vaporizer .................................................................................................. 13-21
13.4.1 Assemble the Vaporizer................................................................................ 13-21
13.4.2 Fill the Vaporizer.......................................................................................... 13-25
13.4.3 Drain the Vaporizer ...................................................................................... 13-27
13.5 Install/Replace the Gas Cylinder............................................................................... 13-29
13.6 Install Modules.......................................................................................................... 13-31
13.6.1 Install the CO2 Module ................................................................................ 13-31
13.6.2 Install the AG Module .................................................................................. 13-31
13.6.3 Install the BIS Module ................................................................................. 13-32
13.7 Pneumatic Connectors............................................................................................... 13-32
13.7.1 Connect the Pipeline Gas Supplies............................................................... 13-33
13.7.2 Install the Gas Cylinder................................................................................ 13-34
13.8 CIS Connector........................................................................................................... 13-34
13.9 Scavenging ................................................................................................................ 13-34
13.10 AGSS Transfer and Receiving System.................................................................... 13-35
13.10.1 Components................................................................................................ 13-35
13.10.2 Assemble the AGSS ................................................................................... 13-36
13.10.3 Waste Gas Disposal System ....................................................................... 13-37
14 Cleaning and Disinfection............................................................................................ 14-1
14.1 Clean and Disinfect the Anesthesia Machine Housing................................................ 14-2
14.2 Disassemble the Breathing System Cleanable Parts ................................................... 14-2
14.2.1 O2 Sensor....................................................................................................... 14-3
14.2.2 Manual Bag .................................................................................................... 14-4
14.2.3 Breathing Tubes ............................................................................................. 14-5
14.2.4 Airway Pressure Gauge .................................................................................. 14-6
14.2.5 Bag Arm ......................................................................................................... 14-6
14.2.6 Bellows Assembly.......................................................................................... 14-7
14.2.7 Flow Sensor.................................................................................................... 14-8
14.2.8 Expiratory Check Valve Assembly................................................................. 14-9
14.2.9 Inspiratory Check Valve Assembly ................................................................ 14-9
14.2.10 Sodalime Canister ...................................................................................... 14-10
14.2.11 Water Collection Cup ..................................................................................14-11
14.2.12 Breathing system........................................................................................ 14-12
14.2.13 AGSS Transfer and Receiving System....................................................... 14-13
14.3 Clean&Disinfect and Re-install the Breathing System ............................................. 14-15
14.3.1 Breathing system.......................................................................................... 14-17
14.3.2 Water Collection Cup ................................................................................... 14-17
14.3.3 Manual Bag .................................................................................................. 14-17
14.3.4 Breathing Mask ............................................................................................ 14-18
14.3.5 Inspiratory and Expiratory Check Valves Assembly .................................... 14-18
14.3.6 Bellows Assembly........................................................................................ 14-18
Summary of Contents for WATO EX-65
Page 1: ...WATO EX 65 Anesthesia Machine Operator s Manual ...
Page 2: ......
Page 8: ...VI FOR YOUR NOTES ...
Page 16: ...8 FOR YOUR NOTES ...
Page 25: ...2 3 2 2 Equipment Appearance 2 2 1 Front View Display and control panel ...
Page 27: ...2 5 Breathing system ...
Page 29: ...2 7 2 2 2 Rear View Power supply ...
Page 31: ...2 9 Anesthesia information system CIS ...
Page 42: ...3 8 FOR YOUR NOTES ...
Page 66: ...4 24 FOR YOUR NOTES ...
Page 148: ...11 8 FOR YOUR NOTES ...
Page 152: ...12 4 FOR YOUR NOTES ...
Page 222: ...A 6 FOR YOUR NOTES ...
Page 244: ...B 22 FOR YOUR NOTES ...
Page 250: ...C 6 FOR YOUR NOTES ...
Page 264: ...D 14 FOR YOUR NOTES ...
Page 274: ......
Page 275: ......
Page 276: ...P N 046 000203 00 1 0 ...