6-1
6
Preoperative Test
6.1 Preoperative Test Schedules
6.1.1 Test Intervals
Perform the preoperative tests listed below at these events:
1. Before each patient.
2. When required after a maintenance or service procedure.
The following table indicates when a test must be done.
Test Item
Test Intervals
Pipeline tests
Cylinder tests
Flow control system tests
Every day before the first patient
Inspect the system
Alarm tests
Power failure alarm test
Breathing system tests
O2 Flush Test
Preoperative preparations
Inspect the AGSS
Before each patient
NOTE
z
Read and understand the operation and maintenance of each component before
using the anesthesia machine.
z
Do not use the anesthesia machine if a test failure occurs. Contact us immediately.
z
A checklist of the anesthetic system should be provided including aneshetic gas
delivery system, monitoring device, alarm system and protective device which are
intended to be used for the anesthetic system, whether they are used alone or
assembled together.
Summary of Contents for WATO EX-65
Page 1: ...WATO EX 65 Anesthesia Machine Operator s Manual ...
Page 2: ......
Page 8: ...VI FOR YOUR NOTES ...
Page 16: ...8 FOR YOUR NOTES ...
Page 25: ...2 3 2 2 Equipment Appearance 2 2 1 Front View Display and control panel ...
Page 27: ...2 5 Breathing system ...
Page 29: ...2 7 2 2 2 Rear View Power supply ...
Page 31: ...2 9 Anesthesia information system CIS ...
Page 42: ...3 8 FOR YOUR NOTES ...
Page 66: ...4 24 FOR YOUR NOTES ...
Page 148: ...11 8 FOR YOUR NOTES ...
Page 152: ...12 4 FOR YOUR NOTES ...
Page 222: ...A 6 FOR YOUR NOTES ...
Page 244: ...B 22 FOR YOUR NOTES ...
Page 250: ...C 6 FOR YOUR NOTES ...
Page 264: ...D 14 FOR YOUR NOTES ...
Page 274: ......
Page 275: ......
Page 276: ...P N 046 000203 00 1 0 ...