8-70
8. Check the ACGO assembly.
Required tools:
One negative pressure ball
One test fixture of the circuit transit adapter
One PU tube (6X100)
Two 3106-08-10 adapter connectors
One 3126-06-00 tube plug
One 3126-08-00 tube plug
Two 3126-10-00 tube plugs
Test procedures:
(1) Disable the system switch.
(2) Remove PU tube 21 and PU tube 22 connecting to the ACGO assembly and circuit
adapter. Remove only the end connecting to the ACGO assembly.
(3) Block the end with the pipeline removed using two 3126-10-00 tube plugs.
(4) Perform steps 3 to 7 in 4 Leakage Test on All Pipelines in the Circuit Adapter. If the test
is not passed, the circuit adapter connector or sealing part is damaged. If leakage exists,
insert the removed pipeline to the ACGO assembly. Note that the position of the black
line on PU tubes 21 and 22 should be the same as that before the pipeline is removed.
(5) Remove the hose 52 and hose 53 used to connect the O2 flush assembly and the
vaporizer support assembly to the ACGO assembly. Remove only the end of the hoses
connecting to the ACGO assembly.
(6) Block the end of the ACGO assembly with the hoses removed using the 3126-06-00
tube plug and 3126-08-00 tube plug.
Summary of Contents for WATO EX-55Pro
Page 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Page 2: ......
Page 34: ...2 20 South African standard ...
Page 48: ...2 34 VPM ...
Page 142: ...4 42 ...
Page 196: ...6 26 FOR YOUR NOTES ...
Page 356: ...8 102 FOR YOUR NOTES ...
Page 438: ...9 82 FOR YOUR NOTES ...
Page 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Page 449: ...10 11 ...
Page 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Page 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Page 462: ...10 24 4 3 1 2 ...
Page 473: ......
Page 474: ...PN 046 009688 00 4 0 ...