9-3
9.1.3 Release Pressure
Make sure to bleed down the gas pressure inside the anesthesia machine before disassembling
pneumatic fittings to avoid personal injury or equipment damage. To bleed gas pressure:
1. Close other cylinder valves and disconnect pipeline gas supplies. Do not disconnect the
O2 pipeline. If O2 pipeline is not available, connect O2 cylinder and open the O2
cylinder valve.
2. Set the system switch to ON.
3. Turn on all the flow controls (except O2).
4. Make sure that N2O and AIR pipeline pressure gauges read zero.
5. Disconnect the O2 pipeline supply (or close the O2 cylinder valve). Push the O2 flush
button to bleed O2 from the system.
6. Set the system switch to OFF.
9.2 Disassemble Assemblies
9.2.1 Remove Top Cover Assembly and Top Plate Assembly
1. Fully loosen the three (3) screws fixing the top cover assembly from the rear side and
two side edges of the machine, and remove the assembly by pushing it toward the front
of the machine.
2. Unscrew the eleven (11) combined screws and five (5) socket head cap screws to
remove the top plate.
Summary of Contents for WATO EX-55Pro
Page 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Page 2: ......
Page 34: ...2 20 South African standard ...
Page 48: ...2 34 VPM ...
Page 142: ...4 42 ...
Page 196: ...6 26 FOR YOUR NOTES ...
Page 356: ...8 102 FOR YOUR NOTES ...
Page 438: ...9 82 FOR YOUR NOTES ...
Page 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Page 449: ...10 11 ...
Page 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Page 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Page 462: ...10 24 4 3 1 2 ...
Page 473: ......
Page 474: ...PN 046 009688 00 4 0 ...