8-64
3. Check the bellow housing and the ensure the Automatic/Manual switch is set to Manual.
Required tools:
One anesthesia machine calibration device
One test fixture of the circuit transit adapter
One syringe
Two
Φ
6 silicon tubes
One PU tube (6X300)
One Y-shape tube
Test procedures:
(1) Remove the bellow.
(2) Properly install the bellow housing.
(3) Set Automatic/Manual switch to Manual.
(4) Remove the breathing circuit.
(5) Install the test fixture of the circuit transit adapter on the breathing circuit.
(6) Connect the syringe connector and the pressure sensor interface (positive pressure end)
of the anesthesia machine calibration device to interface 2 corresponding to the drive gas
of the test fixture of the circuit transit adapter through a Y-shape T junction connector
using the Silicon hose (6x300).
Summary of Contents for WATO EX-55Pro
Page 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Page 2: ......
Page 34: ...2 20 South African standard ...
Page 48: ...2 34 VPM ...
Page 142: ...4 42 ...
Page 196: ...6 26 FOR YOUR NOTES ...
Page 356: ...8 102 FOR YOUR NOTES ...
Page 438: ...9 82 FOR YOUR NOTES ...
Page 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Page 449: ...10 11 ...
Page 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Page 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Page 462: ...10 24 4 3 1 2 ...
Page 473: ......
Page 474: ...PN 046 009688 00 4 0 ...