9-28
9.2.28 Remove Gas Reservoir Assembly
1. Remove the cover plate of work surface.
2. Disconnect the pipeline and cables connected with the gas reservoir.
3. Unscrew the two (2) screws to remove the gas reservoir.
9.2.29 Remove O2 Flush Assembly
1. Remove the cover plate of work surface.
2. Unscrew the four (3) M3X8 combined screws and the four (4) M3X8 countersunk head
screws fixing the front panel bracket, to remove the front panel bracket.
3. Unscrew the four (4) M3X8 combined screws fixing the O2 flush bracket and the four (4)
screws fixing the O2 flush assembly on the bracket, to remove the O2 flush assembly.
Summary of Contents for WATO EX-55Pro
Page 1: ...WATO EX 55Pro 65Pro Anesthesia Machine Service Manual ...
Page 2: ......
Page 34: ...2 20 South African standard ...
Page 48: ...2 34 VPM ...
Page 142: ...4 42 ...
Page 196: ...6 26 FOR YOUR NOTES ...
Page 356: ...8 102 FOR YOUR NOTES ...
Page 438: ...9 82 FOR YOUR NOTES ...
Page 447: ...10 9 10 3 2 Hardware Box 2 4 3 5 7 8 6 12 9 10 13 14 15 1 11 ...
Page 449: ...10 11 ...
Page 455: ...10 17 10 3 5 WATO EX 55 Pro 65 Pro Cart Assembly ...
Page 457: ...10 19 10 3 6 WATO EX 55 Pro 65 Pro Pre pak Circuit Bracket Assembly ...
Page 462: ...10 24 4 3 1 2 ...
Page 473: ......
Page 474: ...PN 046 009688 00 4 0 ...