![Huawei Quidway S9300 Configuration Manual - Network Management Download Page 395](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487395.webp)
interface GigabitEthernet1/0/0
port hybrid pvid vlan 110
port hybrid untagged vlan 110
#
interface LoopBack1
ip address 3.3.3.9 255.255.255.255
#
ospf 1
opaque-capability enable
area 0.0.0.0
network 3.3.3.9 0.0.0.0
network 10.2.1.0 0.0.0.255
mpls-te enable
#
return
6.37.15 Example for Configuring the LSP Traceroute Test for the TE
Tunnel
Networking Requirements
l
The OSPF protocol runs on Switch A, Switch B, and Switch C. The three Switches learn
the 32-bit host routes on their loopback interfaces.
l
MPLS, MPLS TE, and MPLS RSVP-TE are enabled on Switch A, Switch B, and Switch
C.
l
MPLS, MPLS TE, and MPLS RSVP-TE are enabled on the VLANIF interfaces connected
toSwitch A, Switch B, and Switch C to set up a TE tunnel from Switch A to Switch C.
The NQA LSP traceroute test is used to test the TE tunnel.
Figure 6-17
Networking diagram for configuring the LSP traceroute test
VLANIF110
10.2.1.1/24
GE2/0/0
SwitchA
GE1/0/0
VLANIF100
10.1.1.1/24
GE1/0/0
VLANIF100
10.1.1.2/24
area 0
Loopback1
1.1.1.9/32
Loopback1
2.2.2.9/32
Loopback1
3.3.3.9/32
GE1/0/0
VLANIF110
10.2.1.2/24
SwitchB
SwitchC
Configuration Roadmap
The configuration roadmap is as follows:
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6 NQA Configuration
Issue 03 (2010-09-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6-175