![Huawei Quidway S9300 Configuration Manual - Network Management Download Page 246](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487246.webp)
An NQA test instance is created and the test instance view is displayed.
Step 3
Run:
test-type
trace
The test type is set to Traceroute.
Step 4
Run:
destination-address
ipv4
ip-address
The destination address of the Traceroute test is configured.
Step 5
Perform the following as required to configure other parameters for the Traceroute test.
l
To configure the VPN instance to be tested, run the
vpn-instance
vpn-instance-name
command.
l
To configure the maximum hops, run the
tracert-hopfailtimes
times
command.
l
To configure the initial TTL value and the maximum TTL value, run the
tracert-livetime
first-ttl
first-ttl
max-ttl
max-ttl
command.
l
To configure the type of service (ToS) value of the test packet, run the
tos
value
command.
l
To configure the source IP address, run the
source-address
ipv4
ip-address
command.
l
To configure the destination port number, run the
destination-port
port-number
command.
l
To configure the NQA test packets to be sent without searching the routing table, run the
sendpacket passroute
command.
Step 6
Run:
start
The NQA test is started.
Select the start mode as required because the
start
command has several forms.
l
To perform the NQA test immediately, run the
start
now
[
end
{
at
[
yyyy
/
mm
/
dd
]
hh
:
mm
:
ss
|
delay
{
seconds
second
|
hh
:
mm
:
ss
} |
lifetime
{
seconds
second
|
hh
:
mm
:
ss
} } ]
command.
The test instance is started immediately.
l
To perform the NQA test at the specified time, run the
start
at
[
yyyy
/
mm
/
dd
]
hh
:
mm
:
ss
[
end
{
at
[
yyyy
/
mm
/
dd
]
hh
:
mm
:
ss
|
delay
{
seconds
second
|
hh
:
mm
:
ss
} |
lifetime
{
seconds
second
|
hh
:
mm
:
ss
} } ] command.
The test instance is started at a specified time.
l
To perform the NQA test after a certain delay period, run the
start
delay
{
seconds
second
|
hh
:
mm
:
ss
} [
end
{
at
[
yyyy
/
mm
/
dd
]
hh
:
mm
:
ss
|
delay
{
seconds
second
|
hh
:
mm
:
ss
} |
lifetime
{
seconds
second
|
hh
:
mm
:
ss
} } ] command.
The test instance is started after a certain delay.
----End
6.10.3 Checking the Configuration
After configuring the traceroute test, you can view the test result.
Prerequisite
The configurations of the Traceroute Test function are complete.
6 NQA Configuration
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6-26
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 03 (2010-09-20)