![Huawei Quidway S9300 Configuration Manual - Network Management Download Page 330](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487330.webp)
No.
Data
1
Administrator name and name of the test group
2
Administrator names and test names of the test members
3
(Optional) Test period of the test group
4
Start mode and end mode of the test
6.29.2 Configuring an NQA Test Group
This part describes how to set parameters for the NQA test group.
Context
Do as follows on the NQA client:
Procedure
Step 1
Run:
system-view
The system view is displayed.
Step 2
Run:
nqa
test-instance
admin-name
test-name
An NQA test instance is created and the test instance view is displayed.
Step 3
Run:
test-type
{
icmp
|
jitter
|
tcp
|
udp
|
snmp
|
lspping
|
lspjitter
|
icmpjitter
|
pwe3ping
}
The test type is set.
Step 4
Run:
switch-to group
The current test is switched to a test group.
Step 5
Run:
quit
Return to the system view.
Step 6
Run:
nqa
test-instance
admin-name
test-name
The view of the existed NQA test is displayed.
Step 7
Run:
join
group
nqa
admin-name
test-name
The current NQA test is added to the created test group.
6 NQA Configuration
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6-110
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 03 (2010-09-20)