![Huawei Quidway S9300 Configuration Manual - Network Management Download Page 357](http://html.mh-extra.com/html/huawei/quidway-s9300/quidway-s9300_configuration-manual-network-management_169487357.webp)
6.35.5 Checking the Configuration
After the alarm threshold for test results is set, you can view the configuration.
Prerequisite
The configurations of the Threshold for the NQA Alarm function are complete.
Procedure
l
Run the
display nqa event
command to check the maximum number of events that can be
configured and the number of events that are configured.
l
Run the
display nqa alarm
command in the NQA view to check the maximum number of
alarms that can be configured and the number of alarms that are configured.
l
Run the
display nqa-agent
[
admin-name
test-name
] [
verbose
] command to Check the
status of the test instance configured on the NQA client.
----End
Example
Run the
display nqa event
command to check the maximum number of events that can be
configured and the number of events that are configured.
<Quidway>
display nqa event
NQA event information:
------------------------------------------------------
NQA Event Max: 5 NQA Event Number: 1
------------------------------------------------------
Run the
display
nqa-alarm
command to check the maximum number of alarms that can be
configured and the number of alarms that are configured.
[Quidway-nqa-admin-icmp]
display nqa alarm
NQA alarm information:
------------------------------------------------------
NQA Alarm Max: 5 NQA Alarm Number: 2
------------------------------------------------------
Run the
display nqa agent
command to check the status of the test instance configured on the
NQA client.
<Quidway>
display nqa-agent
NQA Tests Max:2000 NQA Tests Number: 1
NQA Flow Max:1000 NQA Flow Remained:1000
nqa test-instance admin icmp
test-type icmp
destination-address ipv4 11.1.1.32
frequency 5
alarm 10 rtt-average 2 rising-threshold 200 10 falling-threshold 0 10
alarm 20 lost-packet-ratio 2 rising-threshold 10 10 falling-threshold 1 10
nqa status : normal
6.36 Maintaining NQA
This section describes how to maintain an NQA test instance. You can restart the test instance,
clear the statistics on the test result, or adjust the test operating status to debug a test instance.
6.36.1 Restarting NQA Test Instances
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
6 NQA Configuration
Issue 03 (2010-09-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6-137