AP-25
Appendix 4:
C-MAP CM-93/3 Charts
A4.1 C-MAP
Cartographic
Service
Your ECDIS system has the capability of using and displaying the latest CMAP CM-93/3 worldwide vector chart
database. These charts are fully compliant with the latest IHO S-57 3.1 specifications.
In order to prepare the system for use with the C-MAP CM-93/3 database, there are a number of things that must be
done.
A4.1.1 Registration of the system at C-MAP Norway
Your system that has the capability to use the CM-93/3 database. To do so an Aladdin eToken (supplied by C-MAP)
must be connected to the system (if the system has and supports USB). The eToken provides the system with a
unique System ID that enables C-MAP to issue correct licenses. The actual System ID can be found on the eToken
itself, on the back of the installation CD box or on a sticker placed on the equipment. This ID must be provided on
all chart orders, either by email ([email protected]) or by fax +4751 464701
A4.1.2 Ordering
charts
A chart order may be sent together with system registration as described above. It is essential that the required
information be sent to C-MAP when ordering charts for a system. C-MAP issues order forms specifying the
information that is required, and contains vital information that will allows C-MAP to monitor and maintain your
licenses throughout the lifetime of the system. Charts can be ordered by Zone, Area or Cell and these can be seen on
our Internet pages at www.C-MAP.no or by downloading the Chart Product Catalogue also available on the web
site. Price quotations can be obtained via your chart dealer or direct from your local C-MAP office. Once the license
order has been prepared it should be emailed to [email protected] or faxed to C-MAP Norway AS (+47 51
464701).
A4.1.3 Applying
licenses
Once the order has been received at C-MAP, a license will be generated and transmitted back to the operator. This
may be in the form of a single alphanumerical string (16 characters), or in the form of a file called
PASSWORD.USR. Once this license has been received it should be input using the License Administrator software
designed and supplied by the ECDIS/ECS manufacturer. There are two types of licenses, purchase and subscription.
Purchase licenses are valid indefinitely while subscription licenses need to be renewed every 12 months from the
start of the subscription. Failure to renew a subscription will result in the charts becoming unavailable.
A4.1.4 Troubleshooting
If you are having problems installing your software or charts please check the following before contacting C-MAP:
That you have registered the WORLD database in the GDBADMIN application.
That the registered WORLD database is available.
That you have correctly typed the license string.
Contact Information:
For information or help please call you're nearest C-MAP Office (details can be found
on the reverse side of the C-MAP chart CO box) or contact C-MAP Norway:
C-MAP Norway AS Post Box 212 Hovlandsveien 5 379 Egersund Norway
Tel. +4751464700 Fax.+4751464701
Email: [email protected]
Summary of Contents for FCR-2107 series
Page 42: ...1 Operational Overview 1 20 This page intentionally left blank...
Page 154: ...5 AIS Operation 5 28 This page intentionally left blank...
Page 255: ...7 Vector Chart Material 7 83 Recommended track defined by two beacons...
Page 256: ...7 Vector Chart Material 7 84 Recommended track defined by a building and a beacon...
Page 257: ...7 Vector Chart Material 7 85 Measurement mile tails tails...
Page 298: ...9 Chart Alerts 9 14 This page intentionally left blank...
Page 322: ...10 Route Planning 10 24 This page intentionally left blank...
Page 368: ...14 Backup Operations 14 6 This page intentionally left blank...
Page 404: ...16 Recording Functions 16 16 This page intentionally left blank...
Page 406: ...17 NAVTEX Messages 17 2 This page intentionally left blank...
Page 416: ...19 Parameters Setup 19 8 This page intentionally left blank...
Page 457: ...Appendix 2 IHO ECDIS Chart 1 AP 5 Nature and Man made features Port features...
Page 458: ...Appendix 2 IHO ECDIS Chart 1 AP 6 Depths Currents etc Seabed Obstructions Pipelines etc...
Page 459: ...Appendix 2 IHO ECDIS Chart 1 AP 7 Traffic routes Special areas...
Page 460: ...Appendix 2 IHO ECDIS Chart 1 AP 8 Aids and Services Buoys and Beacons...
Page 461: ...Appendix 2 IHO ECDIS Chart 1 AP 9 Topmarks Color test diagram...
Page 462: ...Appendix 2 IHO ECDIS Chart 1 AP 10 Mariners navigational symbols...
Page 469: ...Appendix 3 Interpreting S57 Charts AP 17 Fog signals Radars Services...
Page 476: ...Appendix 3 Interpreting S57 Charts AP 24 This page intentionally left blank...
Page 511: ...Appendix 5 Digital Interface AP 59 NRX NAVTEX received data...
Page 544: ...Appendix 6 Parts List and Parts Location AP 92 This page intentionally left blank...
Page 550: ...This page is intentionally left blank...
Page 556: ......