7. Vector Chart Material
7-41
7.6.4
Managing permits from an RENC
Permits are used to control the right to use a chart in the chart radar. A permit in an RENC ENC service is connected
to an edition of a chart. Permits are issued in different types:
•
Subscription permit:
This type of permit includes updates for subsequent 12 months.
•
One-Off permit:
This type of permit includes only updates up to the issue date of the permit.
The expiry date of a permit controls the loading of base charts and their updates to the chart radar. The chart radar
will warn you when you are loading charts or updates which are issued less than 30 days before the expiration date
of a permit. If a permit has expired, it is impossible to load a chart or its update which was issued after the expiration
date of the permit. The user has a right to view a chart forever, but it will not complete the requirements for having
up-to-date charts. To view the Chart Permits window, open the Chart menu and choose Chart Permits.
1.
2.
3.
4.
5.
6.
.
Description of the chart permits window
1.
Public Key
lets you view a public key or load a new one.
2.
Load File
enables downloading from an RENC when you receive permits from that RENC.
3.
Backup
makes a back-up copy of permits.
4.
The
Edt (Edition)
field displays edition number of a chart to which the permit is valid. Note that when a new
edition of a chart is issued a new permit is required. It is possible to have permits for different editions of the
same chart.
5.
The
Type
field shows type of permit held for a chart: S, Subscription or O, One-off.
6.
The
Expires
field shows the expiration date of permits. All subscription-type permits will expire on the same
date.
Summary of Contents for FCR-2107 series
Page 42: ...1 Operational Overview 1 20 This page intentionally left blank...
Page 154: ...5 AIS Operation 5 28 This page intentionally left blank...
Page 255: ...7 Vector Chart Material 7 83 Recommended track defined by two beacons...
Page 256: ...7 Vector Chart Material 7 84 Recommended track defined by a building and a beacon...
Page 257: ...7 Vector Chart Material 7 85 Measurement mile tails tails...
Page 298: ...9 Chart Alerts 9 14 This page intentionally left blank...
Page 322: ...10 Route Planning 10 24 This page intentionally left blank...
Page 368: ...14 Backup Operations 14 6 This page intentionally left blank...
Page 404: ...16 Recording Functions 16 16 This page intentionally left blank...
Page 406: ...17 NAVTEX Messages 17 2 This page intentionally left blank...
Page 416: ...19 Parameters Setup 19 8 This page intentionally left blank...
Page 457: ...Appendix 2 IHO ECDIS Chart 1 AP 5 Nature and Man made features Port features...
Page 458: ...Appendix 2 IHO ECDIS Chart 1 AP 6 Depths Currents etc Seabed Obstructions Pipelines etc...
Page 459: ...Appendix 2 IHO ECDIS Chart 1 AP 7 Traffic routes Special areas...
Page 460: ...Appendix 2 IHO ECDIS Chart 1 AP 8 Aids and Services Buoys and Beacons...
Page 461: ...Appendix 2 IHO ECDIS Chart 1 AP 9 Topmarks Color test diagram...
Page 462: ...Appendix 2 IHO ECDIS Chart 1 AP 10 Mariners navigational symbols...
Page 469: ...Appendix 3 Interpreting S57 Charts AP 17 Fog signals Radars Services...
Page 476: ...Appendix 3 Interpreting S57 Charts AP 24 This page intentionally left blank...
Page 511: ...Appendix 5 Digital Interface AP 59 NRX NAVTEX received data...
Page 544: ...Appendix 6 Parts List and Parts Location AP 92 This page intentionally left blank...
Page 550: ...This page is intentionally left blank...
Page 556: ......