FURUNO
SP - 4
E3559S01B-M
5.
POWER SUPPLY
5.1 Display unit
100-230 VAC, 1ø, 50/60 Hz, 0.6-0.3A
5.2 Radar units
FCR-2117/2817/2117-BB
100-115 VAC, 1ø, 50/60 Hz: 2.6A
1
/3.0A
2
220-230 VAC, 1ø, 50/60 Hz: 1.6A
1
/1.7A
2
FCR-2127/2827/2127-BB
100-115 VAC, 1ø, 50/60 Hz: 3.0A
1
/3.4A
2
220-230 VAC, 1ø, 50/60 Hz: 1.8A
1
/1.9A
2 1
24 rpm,
, 2
42 rpm
FCR-2137S/2837S/2837SW/2137S-BB
100-115 VAC, 1ø, 50/60 Hz: 3.0A
1
/3.0A
2
220-230 VAC, 1ø, 50/60 Hz: 1.7A
1
/1.7A
2
FCR-2827W
100-115 VAC, 1ø, 50/60 Hz: 3.2A (24 rpm)
220-230 VAC, 1ø, 50/60 Hz: 1.8A (24 rpm)
5.3 Chart processor unit
100-230 VAC, 1ø, 50/60 Hz: 1.5A-0.5A
5.4 Switching hub
100-230V AC, 1ø, 50/60 Hz: 0.1A
5.5 S-band antenna
Model
Antenna voltage input (at wind speed 100 kt)
200
VAC,
3ø, 50 Hz/
220 VAC,
3ø, 60 Hz
380 VAC,
3ø, 50 Hz/
440 VAC
3ø, 60 Hz
220 VAC,
3ø, 50 Hz
(HSC)
220 VAC,
3ø, 60 Hz
(HSC)
440 VAC,
3ø, 60 Hz
(HSC)
FCR-2137S(BB)
3.0A 1.5A 3.5A 3.5A 1.7A
FCR-2837S
3.0A 1.5A 3.5A 3.5A 1.7A
FCR-2837SW 3.0A
1.5A
-
-
-
6. ENVIRONMENTAL CONDITIONS
6.1 Useable temperature range
Antenna unit
-25°C to +55°C (s70°C)
Display unit, processor units, control unit, power supply, transceiver
-15°C to +50°C
6.2 Relative humidity
93±3% at 40°C
6.3 Waterproofing
Antenna unit
IPX6 (IEC 60529)
Display unit, processor units, control unit, power supply:
IPX0 (IEC 60529)
Switching hub
IPX0 (IEC 60529)
6.4 Vibration
- From 2 Hz to 5 Hz to up to 13.2 Hz with an excursion of
±1 mm ±10%
-13.2 Hz to 100 Hz with a constant maximum acceleration of
7 m/s
2
Summary of Contents for FCR-2107 series
Page 42: ...1 Operational Overview 1 20 This page intentionally left blank...
Page 154: ...5 AIS Operation 5 28 This page intentionally left blank...
Page 255: ...7 Vector Chart Material 7 83 Recommended track defined by two beacons...
Page 256: ...7 Vector Chart Material 7 84 Recommended track defined by a building and a beacon...
Page 257: ...7 Vector Chart Material 7 85 Measurement mile tails tails...
Page 298: ...9 Chart Alerts 9 14 This page intentionally left blank...
Page 322: ...10 Route Planning 10 24 This page intentionally left blank...
Page 368: ...14 Backup Operations 14 6 This page intentionally left blank...
Page 404: ...16 Recording Functions 16 16 This page intentionally left blank...
Page 406: ...17 NAVTEX Messages 17 2 This page intentionally left blank...
Page 416: ...19 Parameters Setup 19 8 This page intentionally left blank...
Page 457: ...Appendix 2 IHO ECDIS Chart 1 AP 5 Nature and Man made features Port features...
Page 458: ...Appendix 2 IHO ECDIS Chart 1 AP 6 Depths Currents etc Seabed Obstructions Pipelines etc...
Page 459: ...Appendix 2 IHO ECDIS Chart 1 AP 7 Traffic routes Special areas...
Page 460: ...Appendix 2 IHO ECDIS Chart 1 AP 8 Aids and Services Buoys and Beacons...
Page 461: ...Appendix 2 IHO ECDIS Chart 1 AP 9 Topmarks Color test diagram...
Page 462: ...Appendix 2 IHO ECDIS Chart 1 AP 10 Mariners navigational symbols...
Page 469: ...Appendix 3 Interpreting S57 Charts AP 17 Fog signals Radars Services...
Page 476: ...Appendix 3 Interpreting S57 Charts AP 24 This page intentionally left blank...
Page 511: ...Appendix 5 Digital Interface AP 59 NRX NAVTEX received data...
Page 544: ...Appendix 6 Parts List and Parts Location AP 92 This page intentionally left blank...
Page 550: ...This page is intentionally left blank...
Page 556: ......