Power Components Replacement
Service Manual
12-27
Figure 12-15.
Power Supply PCB Removal
1.
Examine the battery cradle for alignment information. Extruded icons on the
battery cradle indicate proper four-pin connector two-pin receptacle orientation.
2.
Orient the new power supply PCB and slide down into the battery cradle retaining
slots and onto the battery cradle standoffs, ensuring the fan cable remains free of
the battery cradle.
3.
Route the fan cable up under the battery cradle so it rests on the appropriate
moulded fin nearest the wire-tied cables.
4.
Replace and tighten both T-10 torx screws to 10 inch-pounds.
5.
Firmly connect the four-pin J2 connector.
6.
Firmly connect the two-pin J1 (AC) and spade E1 (GND) connectors to the recep-
tacles on the opposite side of the power supply board.
Summary of Contents for Nellcor GR101704
Page 1: ...Service Manual Nellcor Bedside Respiratory Patient Monitoring System...
Page 8: ...Page Left Intentionally Blank vi...
Page 32: ...Page Left Intentionally Blank 2 14 Service Manual Product Specifications...
Page 46: ...Page Left Intentionally Blank 3 14 Service Manual Theory of Operations...
Page 54: ...Page Left Intentionally Blank 4 8 Service Manual Product Overview...
Page 114: ...Page Left Intentionally Blank 7 18 Service Manual Trend Data Access...
Page 120: ...Page Left Intentionally Blank 8 6 Service Manual Performance Considerations...
Page 168: ...Page Left Intentionally Blank 10 46 Service Manual Modification and Testing...
Page 192: ...Repair 12 4 Service Manual Figure 12 2 Exploded View of Internal Components...
Page 232: ...Page Left Intentionally Blank 12 44 Service Manual Repair...
Page 235: ......