background image

installation instructions

tabi aura

Doc # 100121 | Rev A

Page 1 of 8

Summary of Contents for Aura

Page 1: ...installation instructions tabi aura Doc 100121 Rev A Page 1 of 8...

Page 2: ...es greatly The Building s Engineer of Record is responsible for the design of building walls which the boards are attached to and must verify the adequacy of the mounting hardware even if provided by...

Page 3: ...ous widths Board size determines the quantity of anchors and screws brackets aura panel s wall anchors 1 1 4 self drilling screws Drill 2 Bit Glass suction cup lifters 2 Pliers Pencil Level 2 or 3 ste...

Page 4: ...ds as often as possible Mounting heights are recommendations only 34 lbs 50 lbs 66 lbs Weight 47 x 48 47 x 72 47 x 96 Size 2 3 4 of studs Recommended Mounting Heights A 75 9 16 B 46 5 8 Horizontal Ori...

Page 5: ...Level brackets and mark holes onto wall Refer to recommended mounting heights noted on page 4 step three Remove brackets from wall and install wall anchors in all hole locations that are not over a s...

Page 6: ...tep five Lower brackets on back of the Aura board onto brackets on wall IMPORTANT Always check to insure both top and bottom panel brackets are resting on the wall brackets NOTE The top and bottom of...

Page 7: ...Page 7 of 8 Doc 100121 Rev A installation instructions step five continued NOTE Consider using glass suction cups when mounting panel Installation of Aura is now complete...

Page 8: ...of PolyVision Corporation or their respective owner PolyVision Corporation reserves the right to make changes in product design construction or detail and to discontinue any product or material withou...

Reviews: