![background image](http://html1.mh-extra.com/html/covidien/nellcor-gr101704/nellcor-gr101704_service-manual_2673898208.webp)
Repair
12-20
Service Manual
Figure 12-12.
Initial Chassis Disassembly
12.5.3
Monitoring System Chassis Reassembly
To reassemble the monitoring system chassis
1.
Position the front chassis on a static-free work surface, still lying face down, within reach
of the back chassis connectors.
2.
Firmly connect the spade connector (GND) to the J21 mating blade on the Main
PCB.
3.
Firmly connect the five-pin battery connector to the J23 receptacle on the Main PCB.
4.
Firmly connect the four-pin power connector to the J22 receptacle on the Main PCB.
5.
Firmly connect the three-pin fan connector to the J2 receptacle on the Main PCB.
6.
Gently align and place the back chassis onto the front chassis.
Caution:
Do not pinch any wires between the chassis enclosures when
reassembling. Before installing the screws, inspect the entire edge of the
union for even seating.
Summary of Contents for Nellcor GR101704
Page 1: ...Service Manual Nellcor Bedside Respiratory Patient Monitoring System...
Page 8: ...Page Left Intentionally Blank vi...
Page 32: ...Page Left Intentionally Blank 2 14 Service Manual Product Specifications...
Page 46: ...Page Left Intentionally Blank 3 14 Service Manual Theory of Operations...
Page 54: ...Page Left Intentionally Blank 4 8 Service Manual Product Overview...
Page 114: ...Page Left Intentionally Blank 7 18 Service Manual Trend Data Access...
Page 120: ...Page Left Intentionally Blank 8 6 Service Manual Performance Considerations...
Page 168: ...Page Left Intentionally Blank 10 46 Service Manual Modification and Testing...
Page 192: ...Repair 12 4 Service Manual Figure 12 2 Exploded View of Internal Components...
Page 232: ...Page Left Intentionally Blank 12 44 Service Manual Repair...
Page 235: ......