220kV Busbar
300/1
15 / 0,1
kV
4000/5
100 MVA
242/15,65 kV
Yd5
U
L1L2
, U
L2L3
G
P
Q
100MVA
15,65kV
IEC09000041-1-en.vsd
IED
IEC09000041-1-EN V1 EN-US
Figure 392:
Single line diagram for generator application
In order to measure the active and reactive power as indicated in figure
, it is
necessary to do the following:
1. Set correctly all CT and VT data and phase angle reference channel
PhaseAngleRef
“Setting of the phase reference channel”
) using
PCM600 for analog input channels
2. Connect, in PCM600, measurement function to the generator CT & VT inputs
3. Set the setting parameters for relevant Measurement function as shown in the
following table:
Section 18
1MRK 506 369-UEN B
Monitoring
774
Line distance protection REL670 2.2 IEC
Application manual
Summary of Contents for REL670 2.2 IEC
Page 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 32: ...26 ...
Page 70: ...64 ...
Page 110: ...104 ...
Page 152: ...146 ...
Page 564: ...558 ...
Page 570: ...564 ...
Page 592: ...586 ...
Page 706: ...700 ...
Page 804: ...798 ...
Page 848: ...842 ...
Page 860: ...854 ...
Page 882: ...876 ...
Page 896: ...890 ...
Page 906: ...900 ...
Page 907: ...901 ...