Where:
Uph
is phase to earth voltage at the relay point
Iph
is phase current in the faulty phase
3I0
is earth fault current
Z1
is positive sequence impedance
Z0
is zero sequence impedance
Z
0m
A
B
Z<
Z<
IEC09000250_1_en.vsd
IEC09000250 V1 EN-US
Figure 112:
Class 1, parallel line in service
The equivalent circuit of the lines can be simplified, see figure
.
A
B
C
Z
0m
Z
0m
Z
0
-
Z
0m
Z
0
-
IEC09000253_1_en.vsd
IEC09000253 V1 EN-US
Figure 113:
Equivalent zero sequence impedance circuit of the double-circuit,
parallel, operating line with a single phase-to-earth fault at the
remote busbar
When mutual coupling is introduced, the voltage at the relay point A will be
changed according to equation
0
0
0
0
1
1
3
3
3 1
3 1
m
L
L
ph
p
ph
L
L
L
Z
Z
Z
U
Z
I
I
I
Z
Z
æ
ö
-
=
×
+
×
+
ç
÷
×
×
è
ø
IECEQUATION1276 V3 EN-US
(Equation 110)
By dividing equation
and after some simplification we can
write the impedance present to the relay at A side as:
3 0
1 1
3 0
æ
ö
×
=
+
ç
÷
+
×
è
ø
L
I
KNm
Z
Z
I ph
I
KN
EQUATION1277 V3 EN-US
(Equation 111)
Where:
KNm
= Z0m/(3 · Z1L)
1MRK 506 369-UEN B
Section 8
Impedance protection
Line distance protection REL670 2.2 IEC
219
Application manual
Summary of Contents for REL670 2.2 IEC
Page 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 32: ...26 ...
Page 70: ...64 ...
Page 110: ...104 ...
Page 152: ...146 ...
Page 564: ...558 ...
Page 570: ...564 ...
Page 592: ...586 ...
Page 706: ...700 ...
Page 804: ...798 ...
Page 848: ...842 ...
Page 860: ...854 ...
Page 882: ...876 ...
Page 896: ...890 ...
Page 906: ...900 ...
Page 907: ...901 ...