should take the duration of the breaker closing time of the master into
consideration before sending the breaker closing command. A setting
tWaitForMaster
sets a maximum wait time for the
WAIT
input to reset. If the wait
time expires, the reclosing cycle of the slave is inhibited. If auto reclosing of the
first breaker is unsuccessful, the
UNSUCCL
output connected to the
INHIBIT
input
of the slave unit interrupts the auto reclosing sequence of the latter.
The signals can be cross-connected to allow simple changing of the
priority by just setting the High and the Low priorities without
changing the configuration. The input
CBCLOSED
for each circuit
breaker is important in multi-breaker arrangements to ensure that
the circuit breaker was closed at the beginning of the cycle. If the
High priority circuit breaker is not closed the High priority moves
to the low priority circuit breaker.
1MRK 506 369-UEN B
Section 15
Control
Line distance protection REL670 2.2 IEC
633
Application manual
Summary of Contents for REL670 2.2 IEC
Page 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 32: ...26 ...
Page 70: ...64 ...
Page 110: ...104 ...
Page 152: ...146 ...
Page 564: ...558 ...
Page 570: ...564 ...
Page 592: ...586 ...
Page 706: ...700 ...
Page 804: ...798 ...
Page 848: ...842 ...
Page 860: ...854 ...
Page 882: ...876 ...
Page 896: ...890 ...
Page 906: ...900 ...
Page 907: ...901 ...