![ABB REL670 2.2 IEC Applications Manual Download Page 537](http://html.mh-extra.com/html/abb/rel670-2-2-iec/rel670-2-2-iec_applications-manual_4789537.webp)
•
Inverse Time Over Current IDMT curve: IEC very inverse, with multiplier k=1
•
Start current of 185% of generator rated current at rated generator voltage
•
Start current 25% of the original start current value for generator voltages
below 25% of rated voltage
To ensure proper operation of the function:
1. Set
Operation
to
On
2. Set
GlobalBaseSel
to the right value in order to select the Global Base Values
Group with
UBase
and
IBase
equal to the rated phase-to-phase voltage and the
rated phase current of the generator.
3. Connect three-phase generator currents and voltages to VRPVOC in the
application configuration.
4. Select
Characterist
to match the type of overcurrent curves used in the
network
IEC Very inv.
5. Set the multiplier
k
=
1
(default value).
6. Set
tDef_OC
=
0.00
s, in order to add no additional delay to the trip time
defined by the inverse time characteristic.
7. If required, set the minimum operating time for this curve by using the
parameter
tMin
(default value 0.05 s).
8. Set
StartCurr
to the value 185%.
9. Set
VDepMode
to
Slope
(default value).
10. Set
VDepFact
to the value 25% (default value).
11. Set
UHighLimit
to the value 100% (default value).
All other settings can be left at the default values.
9.14.3.3
Overcurrent protection with undervoltage seal-in
GUID-B58E1CD6-F9AE-4301-ABE7-90DBFC987D69 v6
To obtain this functionality, the IED application configuration shall include a logic
in accordance to figure
and, of course, the relevant three-phase generator
currents and voltages shall be connected to VRPVOC. Let us assume that, taking
into account the characteristic of the generator, the excitation system and the short
circuit study, the following settings are required:
•
Start current of the overcurrent stage: 150% of generator rated current at rated
generator voltage;
•
Start voltage of the undervoltage stage: 70% of generator rated voltage;
•
Trip time: 3.0 s.
The overcurrent stage and the undervoltage stage shall be set in the following way:
1. Set
Operation
to
On
.
2. Set
GlobalBaseSel
to the right value in order to select the Global Base Values
Group with
UBase
and
IBase
equal to the rated phase-to-phase voltage and the
rated phase current of the generator.
3. Set
StartCurr
to the value
150
%.
1MRK 506 369-UEN B
Section 9
Current protection
Line distance protection REL670 2.2 IEC
531
Application manual
Summary of Contents for REL670 2.2 IEC
Page 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 32: ...26 ...
Page 70: ...64 ...
Page 110: ...104 ...
Page 152: ...146 ...
Page 564: ...558 ...
Page 570: ...564 ...
Page 592: ...586 ...
Page 706: ...700 ...
Page 804: ...798 ...
Page 848: ...842 ...
Page 860: ...854 ...
Page 882: ...876 ...
Page 896: ...890 ...
Page 906: ...900 ...
Page 907: ...901 ...