Mechanical installation
25
Mechanical installation
What this chapter contains
The chapter describes the mechanical installation procedure of the drive.
Unpacking the drive
The drive (1) is delivered in a package that also contains the following items (frame
size R1 shown in the figure):
• plastic bag (2) including clamping plate (also used for I/O cables in frame size R3
and R4), I/O clamping plate (for frame sizes R0…R2), fieldbus option ground
plate, clamps and screws
• panel cover (3)
• mounting template, integrated into the package (4)
• user’s manual (5)
• possible options (fieldbus, potentiometer, encoder, all with instructions, Basic
Control Panel or Assistant Control Panel).
1
2
5
3
POWER
FAULT
4
Summary of Contents for ACS350 Series
Page 1: ...ACS350 User s Manual ACS350 Drives 0 37 22 kW 0 5 30 HP ...
Page 4: ......
Page 8: ...Safety 8 ...
Page 18: ...Table of contents 18 ...
Page 24: ...Hardware description 24 ...
Page 44: ...Installation checklist 44 ...
Page 56: ...Start up control with I O and ID Run 56 ...
Page 140: ...Program features 140 ...
Page 242: ...Actual signals and parameters 242 ...
Page 266: ...Fieldbus control with embedded fieldbus 266 ...
Page 284: ...Fault tracing 284 ...
Page 288: ...Maintenance and hardware diagnostics 288 ...
Page 309: ...Dimensions 309 Frame size R2 IP20 NEMA 1 3AFE68586658 A Frame size R2 IP20 NEMA 1 VAR EMC ...
Page 311: ...Dimensions 311 Frame size R3 IP20 NEMA 1 3AFE68579872 B Frame size R3 IP20 NEMA 1 VAR EMC ...
Page 313: ......