2. INSTALLATION
2 - 2
(1) Installation of one servo amplifier
Control box
Control box
40mm
or more
Servo amplifier
10mm
or more
10mm
or more
Wiring
allowance
80mm
40mm
or more
Top
Bottom
(2) Installation of two or more servo amplifiers
POINT
MR-J3W- B can be installed side-by-side.
However, use MR-J3W-44B with the
effective load ratio of 90 or less.
Leave a large clearance between the inner surface of a control box and the servo amplifier to circulate air above
and below the servo amplifier.
When installing the servo amplifiers closely, leave a clearance of 1mm between the adjacent servo amplifiers in
consideration of mounting tolerances.
1mm
1mm
Control box
30mm
or more
30mm
or more
100mm
or more
40mm
or more
30mm
or more
30mm
or more
100mm
or more
40mm
or more
10mm
or more
Control box
Leaving clearance
Mounting closely
Top
Bottom
Содержание MELSERVO-J3W Series
Страница 17: ...8 MEMO ...
Страница 27: ...1 FUNCTIONS AND CONFIGURATION 1 10 MEMO ...
Страница 87: ...4 STARTUP 4 14 MEMO ...
Страница 117: ...5 PARAMETERS 5 30 MEMO ...
Страница 129: ...6 GENERAL GAIN ADJUSTMENT 6 12 MEMO ...
Страница 185: ...10 CHARACTERISTICS 10 8 MEMO ...
Страница 241: ...11 OPTIONS AND AUXILIARY EQUIPMENT 11 56 MEMO ...
Страница 274: ...13 USING A LINEAR SERVO MOTOR 13 25 1 2 3 4 ...