ENGLISH
USE AND MAINTENANCE
Page 218
Cod. F07022408
MAINTENANCE WORK
All the operations described below must be done at the beginning and end of each season.
When doing maintenance work always respect the regulations contained in the chapter “MAINTENANCE AND
ADJUSTMENT”.
OPERATIONS TO BE DONE
DAYS
MONTHS
BALE
Check the state of wear and the integrity of the tractor connecting
elements and of the structural elements.
1
Check the condition of the supports, bearings, pins and shafts.
7
Check the tension of the chains.
3
Check the bearings of the roll-holder and the bushings of the spring
bearing bar of the reel-holder.
7
Check the cams and the collection tines of the pick-up.
1
Check the securing screws of the rollers of the primary and secondary belt
stretcher arms.
7
Check the belts and the belt clinching.
1
Check the pressure of the tyres.
1
Check that the jacks, hydraulic tubes and fittings do not have any oil leaks.
7
Check the oil level in the deviation box.
1
1000
Check the oil filter of the automatic oiling system.
12
Check and sharpen the knives (HTC, HTU).
300
Check that the electrical light system works for road transport.
1
Check the cables and sensors.
6
Check if bolts and screws are correctly tightened.
1
Check the welds.
12
Check the condition of the adhesive safety signs (pictograms).
1
Check the condition of all the protection guards and safety measures.
1
•
Grease and lubricate in accordance with the times described in the table “MAINTENANCE AND
ADJUSTMENT”.
•
At the beginning and end of each season always give your round baler a complete and thorough cleaning.
Содержание EXTREME 266 HTC
Страница 2: ......
Страница 226: ...ENGLISH USE AND MAINTENANCE Page 224 Cod F07022408 UNIFIED WIRING CONN B UNIFIED WIRING CONN C...
Страница 229: ...USE AND MAINTENANCE ENGLISH Cod F07022408 Page 227 WORKING LIGHTS AND SERVICE WIRING...
Страница 238: ...ENGLISH USE AND MAINTENANCE Page 236 Cod F07022408...
Страница 239: ......