Installing the left control panel
l
Follow the safety guidelines listed in
Follow the below steps to install the left Control Panel:
1. Route the control panel cable through the side wall of the system.
2. Align the left control panel assembly with the control panel slot on the system and place
the assembly in the slot on the system.
3. Connect the control panel cable to the system board connector.
4. Using Phillips #1 screwdriver, install the screws that secure the cable cover to the system.
After installing the left control panel you could do the following:
1. Follow the safety guidelines listed in
.
2. Install the air shroud.
3. Install the internal PERC riser.
4. Follow the procedure listed in
Before working inside your system
Removing the Right Control Panel
l
Follow the safety guidelines listed in
l
Follow the procedure listed in
Before working inside your system.
l
Remove the internal PERC riser.
Follow the below steps to remove the right Control Panel:
1. Lift the cable latch and disconnect the control panel cable from the connector on the
system board.
Installing and Removing System Components
Control panel
97
GigaVUE-FM Hardware Appliance Guide for GFM-HW1-FM010 and GFM-HW1-FM001-HW