Commissioning
Parameter manual
b maXX
BM5800
Document No.: 5.16029.03
27
2
2.6
Performing the commissioning (using Axis 1 as an example)
Begin the commissioning after you have completed the preparations.
1
Connect the power supplies to the b maXX
(main power control voltage).
2
Establish communication as described in
3
Start the ProDrive program (if it is not already running).
4
Then click on "Drive Manager" in ProDrive
Figure 9:
ProDrive: Project tree for Drive Manager
Acknowledging
warnings/errors
5
"Acknowledge" any warnings/errors that may be present in the "Drive Management"
window (press the "Reset errors" button several times if necessary)
NOTE
Any queued error messages may result from the as yet incomplete parameter setting.
These errors cannot be acknowledged.
Содержание b maXX BM5800
Страница 10: ...Parameter manual b maXX BM5800 Document No 5 16029 03 Baumüller Nürnberg GmbH 10 of 814 Contents ...
Страница 724: ...Monitoring Parameter manual b maXX BM5800 Document No 5 16029 03 Baumüller Nürnberg GmbH 724 of 814 3 11 ...
Страница 756: ...Error descriptions Parameter manual b maXX BM5800 Document No 5 16029 03 Baumüller Nürnberg GmbH 756 of 814 4 5 ...
Страница 800: ...Parameter manual b maXX BM5800 Document No 5 16029 03 Baumüller Nürnberg GmbH 800 of 814 ...
Страница 808: ...Parameter manual b maXX BM5800 Document No 5 16029 03 Baumüller Nürnberg GmbH 808 of 814 ...
Страница 814: ...Parameter manual b maXX BM5800 Document No 5 16029 03 Baumüller Nürnberg GmbH 814 of 814 Notes ...
Страница 815: ......