5-108
E
POWR
THERMOSTAT
THERMOSTAT
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
THERMOSTAT REMOVAL
Follow the left “Step” for removal.
1
Band
1
2
Clamp/cooling water hose
1/1
È
For cooling water outlet on stern side.
3
Clamp/cooling water hose
2/1
4
Clamp/cooling water hose
1/1
É
For cooling water pilot outlet on starboard
side.
5
Band/grease hose
1/1
6
Bolt
2
7
Thermostat housing cover
1
8
Thermostat
1
3
1
3
10
8
7
4
6
5
2
LT
572
LT
572
6
×
35 mm
2nd 7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
1st 3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
È
É
6
×
70 mm
2nd 7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
1st 3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
LT
572
LT
572
13
12
11
12
5.9 N • m (0.59 kgf • m, 4.3 ft • Ib)
9
Summary of Contents for Waverunner FX 160
Page 768: ......
Page 773: ......
Page 774: ...YAMAHA MOTOR CO LTD Printed in Japan Mar 2004 1 1 1 CR E F G S Printed on recycled paper ...