DIB-500 R4.1
Commissioning
78
Installation and Operation Manual 90DIB500IM02 – 5.2
Section 5.7.2 on
page 102
Switching on the voltage
source
Section 5.7.2.1
on page 103
Switching on the equipment
rack
Section 5.7.2.2
on page 103
Connecting the service com-
puter
Section 5.7.2.3
on page 104
Section 5.7.3 on
page 106
Configuring and generating network configurations via the
NMC-515 ConfigurationManager
Section 5.7.4 on
page 107
Creating the download repository
Section 5.7.5 on
page 108
Adapting the IP address (with more than one TIB module)
Section 5.7.6 on
page 108
Performing an initial download via NMC-522 DownloadMan-
ager
Section 5.7.7 on
page 115
Setting a cavity coupler to the
TX frequency
Section 5.8.2 on
page 116
Measuring and checking the carriers (impedance adjustment)
Section 5.8.3 on
page 119
Section 5.9.2 on
page 123
Checking operating statuses
(via the NMC-511 FaultMan-
ager)
Section 5.9.2.1
on page 123
Checking operating statuses
(via the Service and Mainte-
nance Tool, SMT)
Section 5.9.2.2
on page 124
Checking operating statuses
(via LEDs of the TIB)
Section 5.9.2.3
on page 125
Section 5.9.2.4
on page 126
Section 5.9.3 on
page 127
Checking the voice channel
(two carriers)
Section 5.9.3.1
on page 127
Checking the voice channel
(more than two carriers)
Section 5.9.3.2
on page 129
Checking the installation site of the GPS antenna
Section 5.9.4 on
page 130
Section 5.9.5 on
page 131
Table 5.1
Overview of the tasks to be performed
Tasks/work steps
Described in: