Installation and Operation Manual 90DIB500IM02 – 5.2
77
DIB-500 R4.1
Commissioning
5 Commissioning
The following chapter describes the procedure for connecting the electrical system
properly and for commissioning the product on site.
The tasks listed in the following table must be performed for commissioning the
DIB-500 R4.1.
Order of tasks to be performed
When you have completed a work step, always navigate to the next work step via the
overview table to ensure that the tasks are performed in the correct order.
Table 5.1
Overview of the tasks to be performed
Tasks/work steps
Described in:
Removing the top cover of the equipment rack
Section 4.4.1 on
page 63
Connection to the electrical
system
Connection with the grounding system
Section 5.1.2 on
page 79
Section 5.1.3 on
page 81
Connecting the VDC voltage
supply
Section 5.1.3.1
on page 82
Connecting the VAC voltage
supply (optional)
Section 5.1.3.2
on page 84
Section 5.1.4 on
page 86
Connecting E1 connectors
(RJ-45)
Section 5.1.4.1
on page 88
Section 5.1.4.2
on page 89
Section 5.2 on
page 90
Connecting antennas (GPS and TETRA)
Section 5.3 on
page 93
Connecting external alarm sensors
Section 5.4 on
page 95
Connecting external alarms
(optional)
Removing the top cover of the equipment rack
Section 5.5.2 on
page 97
Section 5.5.3 on
page 98
Mounting the top cover of the mounting frame
Section 5.5.4 on
page 101
Mounting the top cover of the equipment rack
Section 5.6 on
page 101