DIB-500 R4.1
Installation
Safety measures
62
Installation and Operation Manual 90DIB500IM02 – 5.2
4.1.3
High power variant
Figure 4.3 visualizes the standard setup options of the high power variant with two carri-
ers in one operation room.
Figure 4.3 Standard setup variant DIB-500 R4.1 with two carriers
4.2 Safety measures
Safety measures must be taken when installing the product.
All the supply lines/cables must be passed or suspended in a way ensuring that:
|
the operation of the device is not impaired,
|
there are no trip hazards for the operator or any other persons,
|
the required minimum distances and cable lengths are complied with.
Further Applicable Document
For information on the site requirements, please refer to the document "Site Require-
ments" included in the scope of delivery.
4.3 Installing equipment racks
Depending on the variant, the DIB-500 R4.1, consisting of multiple equipment cabinet,
will be delivered. In this case, the internal wiring of the equipment cabinets has already
been done ex works.
The procedure for installing individual and stacked equipment cabinets is described in
the following.
You can set up the product on site as follows:
|
in compliance with the site requirements,
|
on a firm and horizontal underground.