Installation and Operation Manual 90DIB500IM02 – 5.2
115
DIB-500 R4.1
Commissioning
Configuring the DIB-500 R4.1
28. Type in the following command:
:wq
29. Press the ENTER key to confirm your input.
➥
The changes will be saved and the configuration file closed.
30. Enter the following command to restart the network component:
reboot
➥
The network component is restarted
Checking the IP addresses (optionally)
If required, check the IP address by establishing an SSH connection via PuTTY. Alter-
natively you can check the availability of the IP addresses of the IntelPC and PowerPC
via the command
ping 10.255.25x.xxx
. 255.25x.xxx corresponds to the respective
IP address, refer to Table 5.13 and Table 5.14.
✓
The procedure for adapting the IP address has been completed.
5.7.7
Performing an initial download via NMC-522 DownloadManager
The NMC-522 DownloadManager network management client transmits the required
data from the download repository to the network elements via an initial download. The
initial download can only be performed on site via the service computer. The initial
download requires a direct Ethernet connection between the service computer and the
first TIB module.
Deleting the ARP buffer
To ensure that the initial download is performed properly, the ARP buffer must be
deleted after the service computer has been connected, refer to section 5.7.3 on page
106.
The procedures for operating the NMC-522 DownloadManager network management
client are described in the related product documents, refer to Table 5.15.
Table 5.15 Required product documents
Product
Document type
NMC-522 DownloadManager
User Manual