Installation and Operation Manual 90DIB500IM02 – 5.2
59
DIB-500 R4.1
Installation
4 Installation
The following chapter describes the procedure for correctly installing the product on
site.
The tasks listed in the following table must be performed for setting up the
DIB-500 R4.1.
Order of tasks to be performed
When you have completed a work step, always navigate to the next work step via the
overview table to ensure that the tasks are performed in the correct order.
Table 4.1
Overview of the tasks to be performed
Tasks/Work steps
Described in:
Section 4.3 on
page 61
Connecting equipment racks
(as of 5 carriers)
Removing the top cover of the equipment rack
Section 4.4.1 on
page 63
Section 4.4.2 on
page 65
Installing the left top hat rail
end bracket
Section 4.4.2.3
on page 66
Establishing the voltage sup-
ply of the LRU
Section 4.4.2.4
on page 67
Section 4.4.2.5
on page 71
Installing the top hat rail
power supply unit
Section 4.4.2.6
on page 72
Installing the right top hat rail
end bracket
Section 4.4.2.7
on page 74
Connecting the equipment racks A and B
Section 4.4.3 on
page 74