DIB-500 R4.1
Commissioning
Connection to the electrical system
86
Installation and Operation Manual 90DIB500IM02 – 5.2
The product may be damaged if the live wires of the voltage supply cable are
connected without grounding.
➔
Connect the green-yellow grounding cable of the grounding conductor first.
➔
Connect the voltage supply cable with the voltage source depending on the con-
nection variant, refer to Figure 5.4 on page 85.
✓
The voltage supply cable has been connected.
Switching on the Voltage Source Later on
Since the commissioning of the network requires additional work steps that need to be
performed in the equipment cabinet, the voltage source must stay switched off for the
time being. Switching on the voltage source is required only later on for the configura-
tion.
5.1.4
Connecting E1
The connecting cables for the corresponding E1 connections are connected via RJ-45
connectors or LSA+ strips in the terminal area of the product. The following connection
types are available for E1 connections:
|
Connecting E1 connectors (RJ-45)
|
Figure 5.5 shows the front view of the connection panel. The corresponding table
describes the components in greater detail.
Figure 5.5 Front view of the connection panel
1
4
2
3
5
7
6