Installation and Operation Manual 90DIB500IM02 – 5.2
65
DIB-500 R4.1
Installation
Connecting equipment racks (as of 5 carriers)
1. Loosen the mounting screws of the grommet using a size PH2 Phillips head screw-
driver, refer to Figure 4.4.
Figure 4.4 Upper equipment rack cover – grommet mounting screws
2. Loosen the fastening screws of the equipment rack top cover using a coin, refer to
Figure 4.5 Equipment rack top cover - fastening screws
The grounding connection may be damaged if you remove the equipment cabi-
net top cover without removing the grounding cable connected on the inside of
the cover.
➔
Cautiously lift the top cover off the equipment cabinet. When doing so, the grounding
cable must not be subject to tensile stress.
3. Loosen the grounding cable by pressing the catch of the blade connector and
pushing the blade connector out of the catch..
4. Remove the top cover of the equipment rack.
✓
You have successfully removed the top cover.