Carry out the following steps:
Risk of injury due to sharp edges. The component features sharp edges. Risk of
injury if you do not wear protective gloves.
➔
Always wear protective gloves when handling the component.
Electric shock when touching live parts. Hardware components in the equipment
cabinet are live.
➔
When performing work in the equipment cabinet, ensure that the voltage source on
site is switched off.
1. Clamp the top hat rail end holder onto the top hat rail in the appropriate position,
2. Tighten the screws using a flat-bladed screwdriver.
✓
You have successfully installed the top hat rail end bracket.
4.4.2.4
Establishing the voltage supply of the LRU
The following tasks are required for establishing the voltage supply of the LRU:
|
Connecting the voltage supply of the top hat rail power supply unit
|
Connecting voltage supply cables to the top hat rail power supply unit
Figure 4.8 shows an overview of the established voltage supply. The associated table
describes them in detail.
Figure 4.8 Overview of the voltage supply of the LRU