F-26 PREPARATION BEFORE STARTING MASS PRODUCTION
7)
Display the WEAR OFFSET screen.
8)
Move the cursor to the tool wear offset number of
the tool to be used using the cursor control keys.
To ensure safe operation, it is recommended to
use the following tool offset numbers for tools
used for spindle 1 and spindle 2, respectively. (S
type)
01 to 12: Tools used for spindle 1
31 to 42: Tools used for spindle 2
9)
Input the tool wear offset amount.
Only when machining a workpiece for the first
time, shift the tool path by following the procedure
below.
<Example>
To carry out test cutting by shifting 0.3 mm in the
radial direction.
a)
Move the cursor to the X-axis data of the wear
offset number of each tool.
b)
For tools used for O.D. cutting, enlarge the
diameter position by 0.3 mm by inputting tool
wear offset data of 0.3.
Input "0.3" using the data entry keys.
c)
Press the
[(+) INPUT]
soft-key.
d)
For tools used for I.D. cutting, reduce the
diameter position by 0.3 mm by inputting tool
wear offset data of
0.3.
Input "
0.3" using the data entry keys.
e)
Press the
[(+) INPUT]
soft-key.
Do not input the offset data in the radial
direction for tools such as centering drills and
drills for cutting at the center of a workpiece.
Repeat steps 8) and 9) for all the tools used for
cutting.
NOTE
NOTE
CAPS
CAPS
J
W
U
R
Q
P
)
N
O
(
SP
F
&
K
]
[
I
L
S
=
#
M
V
@
H
?
Y
D
\
G
E
*
T
B
C
Z
X
7
8
2
4
5
1
A
+
0
;
:
EOB
.
RESET
DELETE
SETTING
OFFSET
POS
SYSTEM
PROG
MESSAGE
NETWORK
INSERT
INPUT
ALTER
HELP
SHIFT
.
9
3
6
CAN
3
.
0
WORK
(+)
INPUT
+ 0.005
- 0.005
GEOM.
WEAR
SET UP
No.
SEARCH
1
F
10
F
2
F
3
F
4
F
5
F
6
F
7
F
8
F
9
F
3
.
0
CAUTION
NOTE