Minimizing downtime ....................................................................................................... 374
Before application downtime ....................................................................................... 374
During application downtime ...................................................................................... 374
Validating integrity of the data .................................................................................... 375
Operating systems dependencies .............................................................................................. 375
Windows operating system ................................................................................................ 375
UNIX operating system (HP_UX, Linux, AIX, Solaris) .............................................................. 375
Checklist examples ................................................................................................................. 376
Step 1. List the source and destination storage array ............................................................. 376
Step 2. List the servers impacted by the data migration project ............................................... 377
Step 3. List the applications, mount points, and paths to the physical device ............................. 377
Step 4. List and create LUN ID mappings ............................................................................. 378
Step 5. List and create Fibre Channel zoning ....................................................................... 378
Assigning LUNs to the MPX200 for data migration ...................................................................... 379
Assigning LUNs from an MSA2012fc array ......................................................................... 379
Assigning LUNs from an MSA1000/1500 array .................................................................. 382
Assigning LUNs from an HDS array .................................................................................... 384
Assigning LUNs from an IBM DS4K/DS5K/LSI array ............................................................. 389
Assigning LUNs from an EVA 4/6/8000 series array ........................................................... 394
Assigning LUNs from an EMC CLARiiON array .................................................................... 396
Index ............................................................................................... 403
12
Summary of Contents for Storageworks 8100 - enterprise virtual array
Page 20: ...20 ...
Page 30: ...MPX200 Multifunction Router overview 30 ...
Page 47: ...Figure 27 iSCSI controller options Remove controller MPX200 Multifunction Router 47 ...
Page 48: ...Managing the MPX200 using HP Command View EVA 48 ...
Page 59: ...Figure 32 Virtual disk properties Figure 33 Host details MPX200 Multifunction Router 59 ...
Page 112: ...MPX200 iSCSI configuration rules and guidelines 112 ...
Page 219: ...Load Balancing Enabled Array License Not Applied MPX200 Multifunction Router 219 ...
Page 248: ...Offline Data Migration 248 ...
Page 258: ...Diagnostics and troubleshooting 258 ...
Page 306: ...Command referencecommand reference 306 ...
Page 330: ... Blade number 1 or 2 Simple Network Management Protocol setup 330 ...
Page 368: ...Saving and restoring the MPX200 configuration 368 ...
Page 402: ...Data migration best practices 402 ...
Page 408: ...408 ...