Thu Sep 10 13:15:49 2009
Seq id: 645 : Job Type: Migration : miguser :COMPLETED : JobId 0(Offline) of
group Group 0 with priority 0 from Target HP HSV200-0 Lun
60:05:08:b4:00:07:59:a4:00:02:a0:00:00:7e:00:00(6) to Target HP HSV200-0 Lun
60:05:08:b4:00:07:59:a4:00:02:a0:00:00:83:00:00(7) with migration size 5.00 GB
Thu Sep 10 13:33:16 2009
Seq id: 646 : Job Type: Migration : miguser :ACKNOWLEDGED : JobId 0(Offline)
of group Group 0 with priority 0 from Target HP HSV200-0 Lun
60:05:08:b4:00:07:59:a4:00:02:a0:00:00:7e:00:00(6) to Target HP HSV200-0 Lun
60:05:08:b4:00:07:59:a4:00:02:a0:00:00:83:00:00(7) with migration size 5.00 GB
Thu Sep 10 13:38:37 2009
Seq id: 647 : Job Type: Migration : miguser :ADDED : JobId 0(Offline) of group
Group 0 with priority 0 from Target HP HSV200-0 Lun Invalid Wwuln(6) to Target
HP HSV200-0 Lun Invalid Wwuln(7) with migration size 5.00 GB
Thu Sep 10 13:38:37 2009
Seq id: 648 : Job Type: Migration : miguser :STARTING MIGRATION : JobId
0(Offline) of group Group 0 with priority 0 from Target HP HSV200-0 Lun Invalid
Wwuln(6) to Target HP HSV200-0 Lun Invalid Wwuln(7) with migration size 5.00 GB
Thu Sep 10 13:39:45 2009
Seq id: 649 : Job Type: Migration : miguser :COMPLETED : JobId 0(Offline) of
group Group 0 with priority 0 from Target HP HSV200-0 Lun Invalid Wwuln(6) to
Target HP HSV200-0 Lun Invalid Wwuln(7) with migration size 5.00 GB
MPX200 (miguser) #>
Using the Verify Migration Job wizard
The Verify Migration Job wizard helps you configure verification jobs to compare data residing on
two LUNs. This ensures the data integrity of the migration process by performing a bit-by-bit comparison
of the data on the source LUN with the corresponding data on the destination LUN.
You can configure a verification job on a pair of source and destination LUNs only after the migration
job configured on that pair has been completed and acknowledged. The Verify Migration Job wizard
is generally the same as the Data Migration wizard (see “
Using the Data Migration
Wizard
” on page 155). All scheduling options and job state changes (start, stop, pause, and so on)
apply in the same way to both verification and migration jobs.
Starting the Verify Migration Job wizard
To start the Verify Migration Job wizard:
1.
Start the iSCSI/FC Router Manager and connect to the MPX200 by providing the IP address of
the MPX200.
2.
Start the Verify Migration Job wizard using one of these methods:
• From the
Wizards
menu, select
Configure Verifying Jobs
.
• In the left pane, open the
Services
page, and then right-click
Configure Verifying Job
.
3.
In the Data Migration Security Check dialog box, enter your miguser password (the default is
migration
), and then click
OK
.
Offline Data Migration
178
Summary of Contents for Storageworks 8100 - enterprise virtual array
Page 20: ...20 ...
Page 30: ...MPX200 Multifunction Router overview 30 ...
Page 47: ...Figure 27 iSCSI controller options Remove controller MPX200 Multifunction Router 47 ...
Page 48: ...Managing the MPX200 using HP Command View EVA 48 ...
Page 59: ...Figure 32 Virtual disk properties Figure 33 Host details MPX200 Multifunction Router 59 ...
Page 112: ...MPX200 iSCSI configuration rules and guidelines 112 ...
Page 219: ...Load Balancing Enabled Array License Not Applied MPX200 Multifunction Router 219 ...
Page 248: ...Offline Data Migration 248 ...
Page 258: ...Diagnostics and troubleshooting 258 ...
Page 306: ...Command referencecommand reference 306 ...
Page 330: ... Blade number 1 or 2 Simple Network Management Protocol setup 330 ...
Page 368: ...Saving and restoring the MPX200 configuration 368 ...
Page 402: ...Data migration best practices 402 ...
Page 408: ...408 ...