5.
In the Data Migration Jobs Options dialog box (see
Figure 93
), specify the job attributes as
follows:
1.
Under Scheduling Type, select one of the following:
• Click
Start Now
to start the job immediately.
• Click
Schedule for Later
, and then enter a Start Time and Start Date.
• Click
Serial Schedule Jobs
, and then assign a priority (1–256) in the Job Priority box,
where a lower value indicates that the job is scheduled earlier than jobs configured with
higher values. For details on Serial Schedule Jobs, see “
Starting serial scheduled
jobs
” on page 163.
2.
In the Group Name box, select a job group name from the list. The group name makes it
easier to view the job status on a group basis.
3.
In the IO Size box, either select one of the default I/O sizes, or enter a custom value.
Figure 93 Data migration jobs: individual
.
6.
To save the data migration job options, click
Apply
or, to abandon changes to this data migration
job, click
Cancel
.
Scheduling an individual data migration job in the CLI
Follow these steps to schedule an individual data migration job in the CLI. (To perform this operation
in the mpx Manager instead, see “
Scheduling an individual data migration job in the CLI
” on page 158.)
1.
Log in to the MPX200 as guest and enter the password.
2.
Open a miguser session using the following command (the default password for misguser is
migration
):
miguser start -p migration
3.
To create a migration job, enter the following command:
migration add
Offline Data Migration
158
Summary of Contents for Storageworks 8100 - enterprise virtual array
Page 20: ...20 ...
Page 30: ...MPX200 Multifunction Router overview 30 ...
Page 47: ...Figure 27 iSCSI controller options Remove controller MPX200 Multifunction Router 47 ...
Page 48: ...Managing the MPX200 using HP Command View EVA 48 ...
Page 59: ...Figure 32 Virtual disk properties Figure 33 Host details MPX200 Multifunction Router 59 ...
Page 112: ...MPX200 iSCSI configuration rules and guidelines 112 ...
Page 219: ...Load Balancing Enabled Array License Not Applied MPX200 Multifunction Router 219 ...
Page 248: ...Offline Data Migration 248 ...
Page 258: ...Diagnostics and troubleshooting 258 ...
Page 306: ...Command referencecommand reference 306 ...
Page 330: ... Blade number 1 or 2 Simple Network Management Protocol setup 330 ...
Page 368: ...Saving and restoring the MPX200 configuration 368 ...
Page 402: ...Data migration best practices 402 ...
Page 408: ...408 ...