B • Installation
Doc. 065051-03 1/08
219
11. Align the syringe piston with the connecting screw mount on the
syringe drive.
12. Insert the syringe drive connecting screw removed in
and
tighten fingertight.
B.4 Injection Valve Plumbing
The injection valve is plumbed at the factory with all tubing and fittings for
connections to the pump, inject port, and column.
A 25
μ
L PEEK sample loop (P/N 042857) is installed between ports 1 and 4.
Other sample loop sizes are available. Contact Dionex for information.
shows the valve connections. This information is for reference,
should you need to replace any tubing or fittings.
Figure B-52. Injection Valve Plumbing
From Pump
0.125-mm (0.005-in)
ID PEEK
Needle Seal Assembly
Sample Loop
10-32
10-32
10-32
10-32
10-32
10-32
10-32
10-32
Waste
From AS
Inject Port
To Column
Column
Switching Valve
or
1
2
4
3
6
5
0.75-mm (0.030-in)
ID PEEK
0.25-mm (0.010-in)
ID PEEK
25 L PEEK
(Other loop sizes,
can be used)
μ
or ultra-low pressure
concentrator columns,
Summary of Contents for As
Page 1: ...AS Autosampler Operator s Manual Document No 065051 Revision 03 January 2008...
Page 190: ...AS Autosampler Operator s Manual 178 Doc 065051 03 1 08...
Page 238: ...AS Autosampler Operator s Manual 226 Doc 065051 03 1 08...
Page 338: ...AS Autosampler Operator s Manual 326 Doc 065051 03 1 08...
Page 355: ...Index Doc 065051 03 1 08 Index 17 Z Z address 255...
Page 356: ...AS Autosampler Operator s Manual Index 18 Doc 065051 03 1 08...