B • Installation
Doc. 065051-03 1/08
195
Connecting to Two Valves Installed in the AS
1. Route the outlet lines from the pump and column in both
chromatography systems through the slot on the right side of the AS
(see
2. Connect the pump outlet line from system #1 to port P (2) on the
bottom injection valve (valve #1) and connect the column outlet line
from system #1 to port C (3) on valve #1 (see
3. Connect the pump outlet line from system #2 to port P (2) on the top
injection valve (valve #2) and connect the column outlet line from
system #2 to port C (3) on valve #2 (see
Figure B-28. Routing Pump and Column Lines to AS Injection Valves
Valve #2
Valve #1
Lines from column
and pump in
system #2
Lines from column
and pump in
system #1
Summary of Contents for As
Page 1: ...AS Autosampler Operator s Manual Document No 065051 Revision 03 January 2008...
Page 190: ...AS Autosampler Operator s Manual 178 Doc 065051 03 1 08...
Page 238: ...AS Autosampler Operator s Manual 226 Doc 065051 03 1 08...
Page 338: ...AS Autosampler Operator s Manual 326 Doc 065051 03 1 08...
Page 355: ...Index Doc 065051 03 1 08 Index 17 Z Z address 255...
Page 356: ...AS Autosampler Operator s Manual Index 18 Doc 065051 03 1 08...